Skip to content
Serving 30A & South WaltonMon–Fri 8–5
Allgood Outdoor Services Inc. — homeAllgood Outdoor Services Inc. — home
Offer$250 off any brick paver projectmention it when you call.

Hardscapes

Hardscape Design & Construction

Hardscape is what turns a yard into rooms. An outdoor kitchen with a real counter, a fire pit with seating built around it, a fountain that masks road noise — these are the things that get a back yard used every evening instead of twice a summer.

We design and build all of it in-house, on the same footings and drainage detailing as our paver work, so the kitchen and the patio it sits on are one job with one crew and one warranty.

Outdoor kitchen and pergola lit at twilight, with a stone-wrapped bar and built-in grill

What we build

  • Outdoor kitchens with built-in grills, counters and storage
  • Bar seating, prep sinks and refrigeration cutouts
  • Wood and gas fire pits, freestanding or built into a seat wall
  • Outdoor fireplaces with real chimneys and stone or stucco cladding
  • Fountains and water features sized to the space
  • Seat walls, pillars, columns and gate piers
  • Pergolas and shade structures on masonry bases
  • Gas, water and electrical runs coordinated with your trades

Typical investment

{{TODO-OWNER: typical starting price for an outdoor kitchen and for a fire feature}}

Quoted after a site visit. Appliance selection and utility runs move the number more than the masonry does.

Warranty

{{TODO-OWNER: workmanship warranty term}}

Workmanship coverage in writing, plus manufacturer warranties on grills, burners and appliances.

How it works

From sketch to first cook

  1. 1Week 1

    Site visit & how you'll use it

    Where the wind comes from, where the sun sits at six, where people already stand — that decides the layout more than the plan does.

  2. 2Week 1–3

    Design & fixed quote

    Plan and elevation drawings with real materials and appliance models, then one written price for the whole build.

  3. 32–4 weeks lead

    Utilities & permitting

    Gas, water and electrical runs coordinated, HOA submittals prepared, and any county permits pulled.

  4. 4Days 1–4

    Footings & structure

    Footings poured, block or steel-frame structure built, and appliance openings framed to the exact spec sheets.

  5. 5Days 4–9

    Cladding, counters & finish

    Stone, brick or stucco cladding, then counters templated and set. Appliances dropped in and connected.

  6. 6Final day

    Commissioning & walkthrough

    Burners tested, drainage checked, and a walkthrough covering operation, care and shutdown for storm season.

Materials & brands

Cladding is Belgard, Tremron or Pavestone veneer, natural stone, or stucco to match the house. Structures are block or non-combustible steel frame — never wood inside a heat enclosure. Counters are granite or dense concrete.

BelgardTremronPavestone

{{TODO-OWNER: confirm preferred grill and burner brands so they can be named here — specific appliance names help this page get cited}}

Built for here

What hardscape has to survive here

Salt on stainless

Standard stainless pits and stains within a season this close to the Gulf. On beachfront jobs we spec marine-grade stainless for doors and drawers and mount appliances so they can be pulled and rinsed.

Storm season

Anything not bolted down is a projectile. We anchor structures to footings, and we walk you through what comes inside and what gets strapped when a storm is named.

HOA and design review

Chimneys, pergolas and anything with a roofline get scrutinised by the review boards in the 30A communities and at Sandestin. We prepare elevations to their submission standards before we order material.

Outdoor kitchen & fire feature questions

How long does an outdoor kitchen take to build?

Most take one to two weeks on site once materials and appliances have arrived. Lead time on counters and appliances is usually longer than the build itself.

Gas or wood for a fire pit?

Gas if you want it lit in thirty seconds and off just as fast, which suits rental homes. Wood if the fire is the point. We build both, and gas needs a line run that is far cheaper to install during the build.

Can you build an outdoor kitchen on an existing patio?

Sometimes. It depends on whether the slab or paver base can carry the point loads. We check that on the site visit — building a masonry kitchen on an inadequate base is how you get a cracked counter in year two.

Do I need a permit for an outdoor fireplace?

Usually yes, because of the chimney and the gas line, and HOA review on top of that in most 30A communities. We handle both. {{TODO-OWNER: confirm current county requirements}}

What about water features and mosquitoes?

Moving water does not breed mosquitoes — standing water does. Every feature we build recirculates continuously and drains fully for the off season.

Can the kitchen and the patio be one project?

Yes, and it should be. Doing the patio first and the kitchen later means cutting into finished pavers to run gas and electrical, and paying to mobilise twice.

Thinking about an outdoor kitchen or fire pit?

Send photos of the space and how you picture using it — we'll sketch a layout and put a number on the whole build.

CallTextGet Quote